作为工业中常常用到的一种设备,必须做好质量管理控制工作。 As a kind of equipment often used in the industry, FRP pickling tanks must do a good job of quality management and control. There are nine major measures for the quality management control of FRP pickling tanks.

1. Establish a quality management system consisting of a project manager, a technical person in charge, and a quality inspector, who have veto power over the engineering branch (sub-branch) and sub-processes.

2. Carry out project quality control in accordance with the construction process of the project, formulate process management of the process and specific engineering quality process control measures, namely the model system, listing system, process inspection system, reward and punishment system, and finished product protection system.

3. For the project management personnel, according to the division of responsibilities, comprehensively consider the influence of various factors on the quality of the project and the balance between people and tasks to prevent human accidents.

4. Strengthen the control of construction production and schedule, and when the conflict between schedule and quality occurs, the schedule will obey the quality.

5. Strengthen material quality control. Raw materials, finished products, and semi-finished products must be carefully verified, and quality, quantity, variety, and specifications must be checked and accepted.

6. Strict inspection system. All construction processes must be carefully inspected in accordance with regulations. If they fail to meet the standards, they must be reworked. After acceptance, they can be transferred to the next process.

7. Self-inspection: The operator conducts self-inspection according to the quality acceptance of the inspection batch during construction, and is reviewed by a full-time quality inspector. After passing the inspection, he fills in a self-inspection form and reports to the quality inspector to ensure that the inspection batch completed by the team reaches the quality target Requirements to create good conditions for the next process.

8. Special inspection: On the basis that the self-inspection meets the requirements, the full-time quality inspector of the project will conduct a re-examination with the relevant professional and technical personnel, and after acceptance, report to the project supervision department for acceptance. During the inspection, strict standards should be adopted for all data to ensure the quality of sub-items and inspection batches.

9. Handover inspection: After each sub-item, inspection batch or previous process passes the special inspection and meets the requirements, the professional and technical leaders of the upper and lower processes are organized to perform the handover acceptance, and go through the handover acceptance procedures.

The above are the nine major measures for quality management and control of FRP pickling tanks. For more related work of pickling tank, you can choose the relevant work of our company.


NEXT: The main processing method of glass fiber reinforced plastic pickling tank
Next: How to extend the service life of FRP pickling tanks
Copyright © 2015 Hebei Yiyang Antai Environmental Protection Equipment Co., Ltd. - FRP pickling tank | FRP purification tower | FRP desulfurization tower | FRP mixing tank All rights reserved.
Address: Chengnan Development Zone, Huanghua City, Hebei Province Telephone: 0317-5628177 Mobile: 15233270999
Fax: 0317-5625066 Website: http://cafethera.com Technical Support: Cangzhou Xianyue Network QQ79471598